000 nam a22 4500
999 _c88925
_d88679
005 20240527092952.0
008 240527b xxu||||| |||| 00| 0 eng 0
040 _a\a NG-ZaABU
_c\c NG-ZaABU
_d\d NG-ZaABU
050 _a\a T 57.88 Sal
_b\b 512944
100 _98292
_aa Salihu, Bashir
245 _a\a Predicting Mean Time Between Failures Using Analytical Hierarchy Process and Artificial Neural Network:
_b\b (A Case of Shiroro Power Generation Station, Niger State))
_c\c / by Bashir Salihu
_h\c [Text]
260 _a\a Zaria:
_b\b Dept. of Mechanical Engineering, ABU
_c\c 2016
300 _a\a xvii,120leaves.:
_b\b ill.
502 _a\a Faculty of Engineering
_b\b Thesis: (M.Sc) Ahmadu Bello University, Zaria
_d\d 2016
504 _a\a Includes bibliographical references
942 _2lcc
_cBK
_h\h 57.88
_k\k T
_m\m Sal