000 | nam a22 4500 | ||
---|---|---|---|
999 |
_c88925 _d88679 |
||
005 | 20240527092952.0 | ||
008 | 240527b xxu||||| |||| 00| 0 eng 0 | ||
040 |
_a\a NG-ZaABU _c\c NG-ZaABU _d\d NG-ZaABU |
||
050 |
_a\a T 57.88 Sal _b\b 512944 |
||
100 |
_98292 _aa Salihu, Bashir |
||
245 |
_a\a Predicting Mean Time Between Failures Using Analytical Hierarchy Process and Artificial Neural Network: _b\b (A Case of Shiroro Power Generation Station, Niger State)) _c\c / by Bashir Salihu _h\c [Text] |
||
260 |
_a\a Zaria: _b\b Dept. of Mechanical Engineering, ABU _c\c 2016 |
||
300 |
_a\a xvii,120leaves.: _b\b ill. |
||
502 |
_a\a Faculty of Engineering _b\b Thesis: (M.Sc) Ahmadu Bello University, Zaria _d\d 2016 |
||
504 | _a\a Includes bibliographical references | ||
942 |
_2lcc _cBK _h\h 57.88 _k\k T _m\m Sal |